This construction allowed the waste water plant to meet newer, stricter guidelines set forth by state and federal codes. Construction included a new oxidation ditch, flow equalization transfer pump station, RAS pump station, plant water pump station, chlorine analyzer, new laboratory building, sludge bed modifications, piping, valves, and all associated equipment.
Project Specs:
- Location: Rockwood, TN
- Square Footage: 2 Acres
- Completion Date: July 2015